Lewisville, TX
65 acre commercial retail dual level mall (1.1M SF) development for the Homart and Herring Marathon Groups. Services included earthwork balance studies, traffic flow analysis, water and wastewater projections and design, fire flow analysis, full sitework design, utilities, coordination with state and local governmental entities, and construction/project administration. Construction Cost: $250M.
Beale AFB, CAPlanning study for a 400 seat outdoor amphitheater in Heritage Park. The proposed facility included: 400 seat amphitheater, dual uni-sex restrooms, stormwater detention facilities and site utilities. The proposed facility was designed to be LEED rated. Estm. Constr. Cost $4.5M
Beale AFB, CA
Planning study for a new main front gate integrating the most current AT/FP standards with an aesthetic functional front gate facility. The proposed facility included: visitors center, commercial and truck inspection facility, heritage museum, automatic pop-up bollards, front entry gate with 4 bays, stormwater detention facilities and site utilities. The proposed facility was designed to be LEED rated. Estm. Constr. Cost $16.5M
Fort Sill, OK
Primary facilities include small range operations center,
operations/storage building, general instruction building, latrine, bleacher enclosure, covered mess, and ammo breakdown building. Anti-terrorism/force
protection measures were included.
Construction Cost: $3.5M.
Fort Sill, OK
43,000 SF Warehouse including CD’s, plans, and specifications. Project included special circumstances dealing with anti-terrorism/force protection measures and cultural/historical site sensitive architectural.
Construction Cost: $7.5M.
Fort Worth, TX
North Fort Hood, TX
Fire Lanes Repaired
Fort Smith, AR
National Historic Site- Restoration of Historic Courthouse
Lake Whitney Construction,
Fort Worth, TX
Altus AFB, OK
5,000 SF maintenance shop which included: Clean Room
and Decontamination Room Design, Advanced Toxic Particulate Separation and HEPA Filtration, Communication System Design, Fire Protection, Environmental Protection and Sustainable Design, Force Protection.Construction Cost: $2.5M.