Vista Ridge Mall

Lewisville, TX

65 acre commercial retail dual level mall (1.1M SF) development for the Homart and Herring Marathon Groups. Services included earthwork balance studies, traffic flow analysis, water and wastewater projections and design, fire flow analysis, full sitework design, utilities, coordination with state and local governmental entities, and construction/project administration. Construction Cost:  $250M.

Outdoor Amphitheater

Beale AFB, CAPlanning study for a 400 seat outdoor amphitheater in Heritage Park.  The proposed facility included: 400 seat amphitheater, dual uni-sex restrooms, stormwater detention facilities and site utilities.  The proposed facility was designed to be LEED rated.  Estm. Constr. Cost $4.5M

Main Entry Gate

Beale AFB, CA

Planning study for a new main front gate integrating the most current AT/FP standards with an aesthetic functional front gate facility.  The proposed facility included: visitors center, commercial and truck inspection facility, heritage museum, automatic pop-up bollards, front entry gate with 4 bays, stormwater detention facilities and site utilities.  The proposed facility was designed to be LEED rated.  Estm. Constr. Cost $16.5M

Modified Record Fire Range

Fort Sill, OK

Primary facilities include small range operations center,
operations/storage building, general instruction building, latrine, bleacher enclosure, covered mess, and ammo breakdown building. Anti-terrorism/force
protection measures were included.  
Construction Cost:  $3.5M. 


TRAINING SUPPORT CENTER Warehouse

Fort Sill, OK
43,000 SF Warehouse including CD’s, plans, and specifications. Project included special circumstances dealing with anti-terrorism/force protection measures and cultural/historical site sensitive architectural.
Construction Cost:  $7.5M.


NAVFAC SE: NAS JRB Fort Worth – Munitions Storage Site Lighting Replacement;

Fort Worth, TX

North Fort Hood

North Fort Hood, TX 

Fire Lanes Repaired

National Park Service 

Fort Smith, AR

National Historic Site- Restoration of Historic Courthouse


Lake Whitney, TX

Lake Whitney Construction, 

USAF Reserve -NAS JRB Fort Worth BLDG. 1776

Fort Worth, TX


C-17 Wing Composite Shop

Altus AFB, OK

5,000 SF maintenance shop which included: Clean Room

and Decontamination Room Design, Advanced Toxic Particulate Separation and HEPA Filtration, Communication System Design, Fire Protection, Environmental Protection and Sustainable Design, Force Protection.Construction Cost:  $2.5M.